Key takeaways
- 891mm is a Swedish home-grown development – this gauge practically doesn't exist outside Sweden.
- About 71 kilometres between Hultsfred and Västervik make the line the longest of its kind in the country.
- The regular traction is diesel, shaped by Swedish railcars and narrow-gauge locomotives.
- Both end points sit on standard-gauge lines – but no through train exists.
- The season is very short. Outside high summer, practically nothing happens on the line.
Contents
- 1.Fact file
- 2.Business areas
- 3.Structure & brands
- 4.History at a glance
- 5.How to recognise the company
- 6.Strengths and weaknesses
- 7.A gauge nobody else built
- 8.The same gauge, two completely different worlds
- 9.Railcars for a closed system
- 10.How to plan a day at the line
- 11.Photographing in forest and lake country
- 12.Operating body, volunteering and what I won’t claim
- 13.Verdict
- 14.Frequently asked questions
Fact file
| Operating form | Heritage railway operation with a mostly volunteer crew; the operating body has changed several times |
|---|---|
| Gauge | 891mm – the Swedish narrow gauge, practically unknown outside Sweden |
| Line | Hultsfred – Västervik, about 71 kilometres |
| Region | Småland and Tjust, south-east Sweden |
| Type of operation | diesel-hauled summer service, steam on selected dates |
| Network connection | Both end points sit on standard-gauge lines – changing trains possible, but no through running |
| Season | very short, centred on the Swedish summer holidays |
| Distinctive feature | the longest surviving line of this gauge in Sweden |
| Official website | www.hwj.nu |
Business areas
Structure & brands
History at a glance
How to recognise Hultsfred–Västerviks Järnväg (HWJ)
Does the train really belong to Hultsfred–Västerviks Järnväg (HWJ)?
- 891mm rather than metre gauge – the vehicles look narrower than at central European narrow-gauge railways
- Swedish railcar design – light 1950s multiple units in narrow-gauge form
- Red timber buildings – station buildings in the typical south Swedish style along the line
- Forest and lakes – the route runs for long stretches through unbroken woodland
- No overhead line – the line is entirely non-electrified
- Draisines on the track – rented rail trolleys run between the train services
Strengths and weaknesses
What the company stands for
- The longest surviving 891mm line in Sweden, with real route length
- Both end points on standard-gauge railways – arrival without a car is fundamentally possible
- Vehicles that run nowhere else outside Sweden
- Forest and lake scenery delivers motifs that open lines lack
- No overhead line – a clear view of train and surroundings
Where it falls short
- Very short season, centred essentially on the Swedish summer holidays
- Few train services per day – missing one costs hours
- The line runs for long stretches away from roads
- There are hardly any reliable sources on the current operating body and fleet
- Steam is the exception; anyone after steam alone must check the date closely
Updated: August 2026 – Eight hundred and ninety-one millimetres. That figure sounds arbitrary, but it’s the key to this railway: it equals three Swedish feet and was never seriously used outside Sweden. The Hultsfred–Västerviks Järnväg runs the longest surviving line of this gauge – about 71 kilometres through the forests and lakes of Småland.
Vehicles you'll only find here
891mm runs nowhere else. Record what you see while you're standing in front of it.
A gauge nobody else built
Narrow-gauge railways emerged wherever standard gauge was too expensive. Which measurement was chosen for that, however, was rarely coordinated: Eastern Europe settled on 750mm, Austria on 760mm, central Europe largely on 1000mm – and southern Sweden on 891mm.
This decision still has consequences today. Vehicles of this gauge can neither be sold, nor swapped, nor used anywhere else; spare parts are made in-house or not at all. Anyone preserving an 891mm railway is thereby preserving a closed system by necessity. That’s the real reason this line is so valuable as a museum piece – and why it stays fragile.
The same gauge, two completely different worlds
891mm isn’t only heritage history. North of Stockholm, a commuter network still runs on this measurement today, with modern vehicles and a dense service. The comparison is worthwhile because it shows how differently the same technical foundation can be used.
| Feature | Hultsfred–Västervik | Commuter network near Stockholm |
|---|---|---|
| Purpose | heritage and tourist traffic | daily commuter service |
| Traction | diesel, no contact wire | electric, under overhead line |
| Vehicles | 1950s railcars | modern local multiple units |
| Operating time | a few summer weeks | year-round on a set frequency |
| Setting | forest and lakes, little development | suburbs and city fringe |
For placing it, that means: the gauge alone says nothing about the character of a railway. Just as little as a logo says about the operator – in Sweden too, brand, vehicle keeper and operating company are three different things, and heritage railways are no exception here.
Anyone drawing the comparison across borders sees the same pattern everywhere. The Lithuanian 750mm railway works with Soviet technology in a closed system, the Harz narrow-gauge railways operate metre gauge as a genuine means of transport with a year-round timetable. Three countries, three gauges, three answers to the question of what a narrow-gauge railway is still for today.
Railcars for a closed system
The backbone is diesel. Characteristic are light Swedish-design railcars from the 1950s in narrow-gauge form – vehicles originally built to keep branch lines running cheaply, and which for exactly that reason still exist today. Add to that narrow-gauge diesel locomotives, passenger cars and service vehicles, plus steam on individual announced dates.
We give no details on specific running numbers here: the serviceable fleet changes, and there are no reliable sources on it. Note down type, livery and train formation instead – that will still hold up in five years’ time.
The contrast with Swedish regular service is enormous. On the country’s standard-gauge main lines, SJ runs tilting trains in long-distance service, and in the south, Swedish and Danish systems meet at the Öresund. Between these trains and a narrow-gauge railcar in Småland lie not just seventy years, but two railway worlds that were never technically related.
The forest eats your spots
On the map, a point along the line often looks ideal. In reality, dense stand grows there, and the train is visible for two seconds. Look for clearings, lakeshores and level-crossing areas with a clear sightline – and mark them in advance, rather than searching on site.
How to plan a day at the line
Check season and running day
The operating period is short. First check whether your travel dates contain any running days at all.
Choose a section, not the whole line
71 kilometres can't sensibly be covered in one day. Decide on one area.
Prepare offline maps
Access roads are partly unpaved and mobile reception in forested areas unreliable.
Work out chasing the train
At low train speed you can catch the same train more than once – if the road runs parallel.
Bring supplies
Away from the end points there's little infrastructure along the line.
Is there enough time for a second spot?
Calculated without time for getting out and setting up - subtract a few more minutes from that.
Rare gauges deserve documenting
You won't see 891mm anywhere else. Log type, place and date while it's fresh.
Photographing in forest and lake country
The low train against tall stand is the central creative challenge. An 891mm vehicle is small; where the forest is dense, it disappears. So deliberately look for openings: clearings, lakeshores, meadow strips. The sun position matters more than usual here, because scattered light in the stand tips quickly – how to check it beforehand is covered in the piece on sun position at the photo spot. For access roads, prepared map material is worthwhile, see using offline maps for spotting.
The spot pays off, if …
- it's reachable from a public path
- an opening in the stand keeps the train visible for a while
- you're sure of the direction of travel
Check first, if …
- access runs via forestry or private tracks
- the way back becomes tricky as dusk sets in
- you're relying on a single train service of the day
Never …
- stand on the track or in a curve of it
- ignore draisine traffic between the trains
- use level crossings as a vantage point
Few trains doesn't mean an empty track
On this line, rented draisines and service vehicles run alongside the trains, for which no timetable is published. On top of that: in closed stand you hear a quiet vehicle only very late. Stay outside the track area, even if nothing comes for hours. What applies legally is set out in the piece on trespassing on tracks.
Operating body, volunteering and what I won’t claim
Honesty matters more here than a smooth formulation. The operating body and organisational form of this railway have changed several times, and the current arrangements can’t be reliably reconstructed from the German-speaking world. What can be said: the operation rests, like practically all heritage railways of this size, on volunteer work – driving duty, workshop, track maintenance and stewarding included.
The effort involved is considerable. Seventy-one kilometres of own infrastructure means track, level crossings, structures and vegetation management over a distance that some regional railways don’t even reach. That this railway still runs at all is therefore not something to take for granted.
Anyone travelling in Sweden anyway can broaden the theme. The Inlandsbanan stands for tourist traffic on standard gauge over very long distances, and in the far north, the ore line near Abisko shows the exact opposite: heavyweight freight instead of heritage narrow gauge. How to plan such trips is described in the piece on Interrail for train fans.
Verdict
This railway isn’t a spontaneous destination. Short season, long journey, few trains – that demands planning. Anyone who puts in the effort sees vehicles and a gauge that doesn’t exist outside Sweden, on a line unusually long for a heritage railway.
Pick a section, plan two spots and work out the chase beforehand. The rest is forest, water, and a train that looks very small in it.
In brief
71 kilometres on 891mm: diesel-hauled summer operation with Swedish railcars – technically unique, tight on timing, strong on scenery.
Summary
- Anyone wanting to see Swedish narrow-gauge technology in operation has, in south-east Sweden, the longest remaining opportunity.
- The gauge isn't a detail, but the reason these vehicles can't be used anywhere else.
- The short season makes timing more important than any choice of location.
- Forest and lakes deliver pictures that open plains don't – but every change of spot costs time.
Frequently asked questions
Why 891 millimetres of all things?
The measurement equals three Swedish feet and arose in the 19th century as a compromise between construction cost and capacity. It became widely established in southern Sweden – and stayed confined to the country. Vehicles of this gauge therefore can't be used anywhere else in Europe, which makes preservation difficult and the collection special.
Does 891mm exist anywhere else?
Yes, in regular service even. North of Stockholm, a commuter network still runs on 891 millimetres today – with modern vehicles and a dense service. So the same gauge exists in two completely different worlds: here as a heritage railway in the forest, there as an urban local transport system. Anyone wanting to see both combines south-east Sweden with a stay at Stockholm Central Station.
How long is the line?
About 71 kilometres between Hultsfred and Västervik. That's exceptionally long for a heritage railway – most European preservation railways come to ten to twenty. The length fundamentally changes the planning: you don't shuttle between two stations, you choose one section of the route.
Does a steam locomotive run here?
Not in regular service. The backbone is diesel-powered vehicles: narrow-gauge railcars of Swedish design from the 1950s and diesel locomotives. Steam runs on individual announced dates. Anyone specifically after steam must therefore check the date, not just the season.
Can I get there by train?
In principle yes, but not through-running. Both Hultsfred and Västervik sit on standard-gauge lines served by regular services; the infrastructure for that sits with Trafikverket, and long-distance transport in the country is run among others by SJ. A through train between standard and narrow gauge naturally doesn't exist – you change trains.
When is the railway operating?
Mainly during the Swedish summer holidays, supplemented by individual event days. That's a considerably shorter season than at central European heritage railways. Exact dates change every year and are in the current seasonal timetable. Plan the running day first – with such a long journey to get there, it decides the whole trip.
What's the story with the draisines?
Rail trolley hire is a widespread offering in Sweden on disused and heritage lines. For visitors that's a way of experiencing the railway in its own right; for photographers it means two things. First, a motif that doesn't exist in regular service. Second: between the trains there can be traffic on the track for which no published timetable exists.
Who runs the railway today?
That can't be seriously answered in one sentence from a distance. The operating body and organisational form have changed several times, and there are hardly any reliable sources on it. What's certain: the operation rests very largely on volunteer work, as with almost all heritage railways of this size. How such structures work is described in the piece on railway associations.
Is a comparison with other narrow-gauge railways worthwhile?
Very much so. The Panevėžys–Rubikiai narrow-gauge railway in Lithuania runs on 750mm with Soviet technology, the Harz narrow-gauge railways operate metre gauge as a genuine means of transport. Three countries, three gauges, three operating philosophies – and in all three cases vehicles that don't fit each other.
Am I allowed to walk along the line?
No. Even with few train services per day, the track and operational installations are not a footpath, and on this line draisine traffic adds to that. Stick to public paths and designated areas. What that means is summarised in the piece on safe distance from the track.
Log vehicles from Hultsfred–Västerviks Järnväg (HWJ)
Company, vehicle, location and date logged in seconds – and visible to the community.
Where you will find Hultsfred–Västerviks Järnväg (HWJ)
Spotting locations where you will regularly come across vehicles from this organisation – with viewpoints, the best light and coordinates.
Stockholm Centralstation
Stockholm Centralstation is Sweden's biggest station – and since the Citybanan tunnel opened, a different place from before: commuter trains now run underground, while long-distance services stayed upstairs. Know both levels and you get the whole of Swedish rail travel in a single morning.
Mountain lineAbisko on the Malmbanan
The Malmbanan between Kiruna and Narvik is the line with the heaviest trains in Europe – and at Abisko it runs through a landscape that carries every photo. The price: very few trains, extreme winter conditions and a journey that costs a whole day.
Border stationHyllie and the Öresund Link
Hyllie is the first station on Swedish soil after the Öresund Link – and so the place where four things change at once: electrification system, direction of travel, currency and jurisdiction. Operationally one of the most interesting points in Scandinavia, though surprisingly monotonous in terms of rolling stock.
More companies
SJ
Sweden got there before the rest of Europe: network and operations were separated as early as 1988, and long-distance passenger services were fully opened up around 2010. SJ is therefore today a state-owned passenger railway among several providers – and it runs on tracks where trains keep to the left.
InfrastructureTrafikverket
Trafikverket isn't a railway company but a state transport authority for both rail and road at once. It owns the network, even commissions some services itself – and yet doesn't run a single train. Hardly any other country has quite this dual role.
BrandInlandsbanan
The Inlandsbanan runs the length of Sweden for around 1,288 kilometres from Värmland to Lapland – without overhead line, with seasonal passenger services and an operating company owned by the municipalities along the route. It is neither a state railway nor a heritage railway, and that in-between position is exactly what makes it interesting.
Heritage railwayPanevėžys–Rubikiai Narrow-Gauge Railway
The Panevėžys–Rubikiai narrow-gauge railway is the last operational remnant of what was once an extensive Lithuanian 750mm network. The entire railway is a protected heritage site – track, stations and rolling stock together. Services run mostly with Soviet-era narrow-gauge diesel locomotives, not steam.
Related guides from the blog
- Offline maps for spotting: reaching the right spot without a signal
- Interrail for railfans: planning a European tour with a camera
- Planning Sun Position at a Photo Spot: Light Instead of Luck
- Railway Clubs in Germany, Austria & Switzerland: Types, Membership, Costs, Tips
- Safety Distance at the Track: The Rules That Save Lives




